General NPDES Renewal

General NPDES Renewal

Use the form below to submit an General NPDES Renwal.

PADEP released the new PAG-02 General NPDES Construction Stormwater Permit on 8/30/2024. This permit is valid through 12/7/2029. Permittees with existing PAG-02 permits are able to renew beyond the previous 12/7/2024 expiration date.  
 

Submission Instructions: 

  • Flatten drawings before uploading. Do not use a zip folder to upload documents.
  • Upload separate PDF files by document type. Pease do not upload a single long PDF document.
  • ACCD strongly prefers payments made online.

    Checks can be mailed normal USPS once applicants have uploaded permit documents and received permit fees via online form. 

Click Here to process payment

Get Assistance with Permits

Get help submitting, uploading and applying for Chapter 102 and Chapter 105 permits.  

Contact